PROJECT
Replaced all feeder cables and control wiring in the existing hydro with all new raceways. Also, replaced relay and controls cabinet.
New arc flash switchgear being installed with crane over the power lines and into the hydro. Power line was de-energized for safety.
New equipment for hydro: arc flash gear, relay and control, and PLC cabinet
New switchgear being rigged to lift over the power lines.
New arc flash switchgear being set at the building entrance
Generator with new conduits being installed
Existing controls circuit breakers. This was all removed and a new arc flash gear was installed in this location.
Back to EVERSOURCE
Back to EATON ELECTRICAL
Back to HYDRO FACILITY MODERNIZATION
Back to PROJECTS