PROJECT
Changed out incoming buss duct, 4000 amp main switch gear line up as well as 21 power panels, 200 amp to 600 amp panels. There was about 150 three phase leads to disconnect and reconnect. There were no phasing issues on startup.
PROJECT
Changed out incoming buss duct, 4000 amp main switch gear line up as well as 21 power panels, 200 amp to 600 amp panels. There was about 150 three phase leads to disconnect and reconnect. There were no phasing issues on startup.