Livermore Hydro, Livermore, ME

PROJECT

2400 volt exposed switches were installed years ago about 8' above the mezzanine level, which prevented personnel from working on the hydro unit below. We removed the exposed switches, rerouted the cable, installed cabling into a 6' x 4' x 2' junction box. This eliminated the hazard of the exposed 2400 volts.

Existing exposed 2400 volt switches

The new splice box being installed