New York Power Authority, Massena, NY

PROJECT

Changed out an oil filled circuit breaker, installed a new SK6 type breaker. Also, did new underground conduit system from OCB to the underground tunnel system that brought the cables back to the control house.

Back to EATON ELECTRICAL

Back to HYDRO FACILITY MODERNIZATION

Back to PROJECTS